BIỆN PHÁP THI CÔNG CẤU KIỆN PHỨC TẠP

HỆ THỐNG CHẶN NƯỚC KRYSTOL - TRÁM LỖ HỔNG TRONG BÊ TÔNG

 

TRÁM ĐẦY LỖ HỔNG TRONG BÊ TÔNG – BẢO VỆ KÉP – BIỆN PHÁP TRÁT VỮA NGOÀI

 

LƯU Ý CỦA NHÀ SẢN XUẤT:

1. ĐỔ BÊ TÔNG ĐƯỢC XỬ LÝ BẰNG MÀNG CHÔNG THẤM TRONG (KIM).

2. PHỦ KHU VỰC BỀ MẶT CỦA MỐI NỐI BẰNG VỮA CHẶN NƯỚC KRYSTOL VỚI TỶ LỆ 1 KG / M2 (0,2 LB./ FT2).

3. TẠO RÃNH 40 MM X 40 MM(1.5 IN. X 1.5 IN.), TỚI 30 MM, ĐƯỜNG RÃNH Ở ĐIỂM GIAO NƠI CÓ HAI PHÂN ĐOẠN BÊ TÔNG GẶP NHAU, TRONG LÚC TẠO HÌNH, HOẶC TRONG KHI BÊ TÔNG CÒN Ở DẠNG DẺO CÓ THỂ ĐÚC ĐƯỢC.

4. CHÈN CHẶT RÃNH ĐÃ ĐƯỢC CHUẨN BỊ TRƯỚC BẰNG VỮA CHẶN NƯỚC KRYSTOL TRÀN LÊN BỀ MẶT VỚI TỶ LỆ 3.33 KG/M (2.23 LB./FT.)

LƯU Ý:

1. THI CÔNG PHẢI ĐƯỢC HOÀN THIỆN THEO THÔNG SỐ KỸ THUẬT CỦA NHÀ SẢN XUẤT.

2. KHÔNG VẼ THEO TỶ LỆ BẢN VẼ.

3. BẢN VẼ NÀY CHỈ ĐƯỢC CÁC KIẾN TRÚC, KỸ SƯ, NHÀ THẦU, CHUYÊN GIA TƯ VẤN VÀ THIẾT KẾ SỬ DỤNG CHO MỤC ĐÍCH LẬP KẾ HOẠCH. KHÔNG SỬ DỤNG BẢN VẼ NÀY CHO THI CÔNG.

4. TẤT CẢ CÁC THÔNG TIN Ở ĐÂY LÀ THỰC TẠI ĐANG PHÁT TRIỂN NHƯNG PHẢI ĐƯỢC NHÀ SẢN XUẤT SẢN PHẨM XEM XÉT LẠI VÀ PHÊ DUYỆT CHO ỨNG DỤNG THỰC TẾ.

5. LƯU Ý CỦA NHÀ THẦU: ĐỂ THAM KHẢO THÔNG TIN SẢN PHẨM VÀ CÔNG TY, HÃY TRUY CẬP www.CADdetails.com/info VÀ SỐ THAM CHIẾU 5104-030

 

Zalo CÔNG TY CP XD VÀ ĐẦU TƯ THƯƠNG MẠI TATUCO
Messenger CÔNG TY CP XD VÀ ĐẦU TƯ THƯƠNG MẠI TATUCO
zalo
popup

Số lượng:

Tổng tiền: